IndustrieTreff - New compressor station was inaugurated in Egtved - MAX STREICHER GmbH & Co. KG aA handed over tu

IndustrieTreff

New compressor station was inaugurated in Egtved - MAX STREICHER GmbH & Co. KG aA handed over turnkey system

ID: 1005922

Deggendorf, January 2014 – A forward-looking project was completed last autumn. Martin Lidegaard, Denmark's Minister for Climate, Energy and Building, inaugurated a new natural gas compressor station in the Danish village Egtved. For two and a half years, MAX STREICHER GmbH & Co. KG aA has designed and constructed the station in a joint venture with PER AARSLEFF A/S and JOHANN BUNTE Bauunternehmung GmbH & Co. KG. The construction was funded as part of the EU's European Energy Programme for Recovery. The new plant secures Denmark's long-term gas supply.

(industrietreff) - STREICHER started working on the EPCC (Engineering – Procurement – Construction – Commissioning) project in January 2011. The contract included the construction of a turnkey system featuring four compressors, as well as replacement and expansion of existing fitting groups. STREICHER-Beteiligungsgesellschaft compact e+p+c+ GmbH & Co. KG was responsible for the complete engineering and was significantly involved in the project management.
A special requirement was to incorporate the architectural request into the planning process. The compressor station had to blend harmoniously into the landscape. A Danish architectural office was assigned to design the façade and thus a modern cube-like building with a metallic exterior was designed.
For a reliable gas supply and a green future
The Egtved compressor station was inaugurated at a ceremony attended by around 240 guests, including Martin Lidegaard, Denmark's Minister for Climate, Energy and Building, and Philip Lowe, the EU Managing Director for Energy. At the same time a 94 km-long gas pipeline between Denmark and Germany was commissioned.
The construction of the compressor station shall guarantee Denmark's gas supply in the long term. The compressor station is located in the heart of Jutland, and is therefore a central point in Denmark's gas pipeline network. The North-South Pipeline running from the gas storage facility in Lille Torup to Ellund and the West-East Pipeline between Nybro and Egtved (which continues on to Sweden via Dragor) meet there. The system's maximum flow rate is up to 1,050,000 m³/h.




Themen in dieser Meldung:


Unternehmensinformation / Kurzprofil:

With a tradition of more than 100 years, the STREICHER Group combines quality and expertise with many years of experience in the business sectors pipeline and plant construction, mechanical engineering, civil and structural engineering as well as raw and construction material. The parent company MAX STREICHER GmbH & Co. KG aA headquartered in Deggendorf (Germany), employs approximately 3,300 specialists at home and abroad.



Leseranfragen:



Kontakt / Agentur:

HeadlineAffairs
Rumfordstr. 5
80469 München
Tel. +49(0)89 23 23 90 92
Fax +49(0)89 23 23 90 99
krittl(at)headline-affairs.de
www.headlineaffairs.com



drucken  als PDF  an Freund senden  IBC SOLAR gibt Startschuss für neues Fachpartner-Netzwerk
Die Mehrheit der DAX-Unternehmen darf Energie nur unter Auflage produzieren
Bereitgestellt von Benutzer: Sarah Spitzl-Kirch
Datum: 16.01.2014 - 10:29 Uhr
Sprache: Deutsch
News-ID 1005922
Anzahl Zeichen: 0

Kontakt-Informationen:
Ansprechpartner:
Stadt:


Telefon:

Kategorie:

Energiewirtschaft


Anmerkungen:


Diese HerstellerNews wurde bisher 657 mal aufgerufen.


Die Meldung mit dem Titel:
"New compressor station was inaugurated in Egtved - MAX STREICHER GmbH & Co. KG aA handed over turnkey system
"
steht unter der journalistisch-redaktionellen Verantwortung von

Max Streicher GmbH & Co. KG aA (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).


Alle Meldungen von Max Streicher GmbH & Co. KG aA